Monday, January 26, 2015

The best-laid plans

Well, well, well.  

Damn.

I took the RV in to get checked over for travel and to have done some stuff which had been scheduled: repack wheel bearings was the biggest item.  It turns out that it needs what may add up to $2500 of work.  I'll spare you the details for now.

Other than what's in front of me now, the rest of the (1999) vehicle looks "pristine," in Buck's words. 

In addition to the cost, this means that I'll have to re-think and probably re-schedule the trip to ABQ, which means the people over there who've arranged the presentations I'm giving will have to scramble to cancel/reschedule.

Bummer. All around.

Film at 11.  


No comments:

Post a Comment